Sector 3 East Dewatering Project

foresite-crest

Pipeline corridor & pads construction. Support requirements from:

  • Concrete foundation installation support
  • Pre-engineering surveys
  • Utility locating of corridor pre-construction
  • GPR surveys on existing wells pad for integrity checks
  • Control network establishment
  • Early works stripping support
  • Earthworks civil construction support for piping corridor, roadways, road crossings, sleeve installs,  outfall structure, wells pads
  • Screw piling installation support
  • Piping installation support
  • Ground cable systems installation support

Like this article?

Share on Facebook
Share on Twitter
Share on LinkedIn
Share on Pinterest