Plant 300 Froth Transfer Line Failure Mitigation

foresite-crest

Underground pipeline was experiencing slack flow and significant wear. Section of the pipeline was to be replaced-in-kind with new coated piping during planned fall outage.

  • Pre-engineering surveys
  • Utility locating of corridor pre-construction
  • Earthworks civil construction support for piping corridor excavation and backfilling operations, safety berm placement
  • Piping installation support